NAS Lemoore - Air Traffic Control Tower

This design / build project required the upmost of coordination and design considerations due to the compact square footage of structure, the amount and complexity of utilities. N+1 redundancy on all mechanical systems, four stages of high efficiency chilled water, primary / secondary variable speed pumping systems, phased carbon filtration to eliminate aviation fuel vapor, demand control ventilation, VAV air hander, computer room air conditioning DDC Controls and UL listed smoke evacuation systems, full ATFP compliance. A-Tek Mechanical performed all equipment start up as the factory authorized representative. The project qualified for 12 LEED points for the mechanical systems.